Bureaucrats, fcfl_members, Administrators
186
edits
Line 63:
=== CAMaster Pro ===
=== Warm Up Procedure ===
Note: Spindle RPM DRO in thousands of RPM
Turn on the air compressor (push red toggle switch backward).
Remove collet from spindle and set aside.
Warm up spindle bearing using the speed control dial on front right of CNC router.
* 5 min at 5k RPM
* 5 min at 10k RPM
* 5 min at 18k RPM
== Maintenance ==
|