Caring for the Space: Difference between revisions

From Fat Cat Fab Lab
Content added Content deleted
(Migrate page from CiviCRM and do small updates: Laser PoC Peter -> Joe. CNC PoC Peter -> Arjen. Fat Cat -> Cellar Dog. Fix spelling errors.)
 
(→‎Laser Maintenance: Clarify which Joe)
Line 7: Line 7:
== Laser Maintenance ==
== Laser Maintenance ==


* Talk to Joe if you are interested in caring for the laser. Here a list of maintenance tasks that need doing at different intervals.
* Talk to Joe Stilin if you are interested in caring for the laser. Here a list of maintenance tasks that need doing at different intervals.
** Lens cleaning
** Lens cleaning
** Mirror cleaning (there are 3, two of which are not difficult to access.)
** Mirror cleaning (there are 3, two of which are not difficult to access.)

Revision as of 03:40, 11 January 2022

Garbage and Recycling

  • Bags can go out any weekday after 5pm in front of Cellar Dog. (75 Christoper St.)
  • If it's after 11pm, look to make sure there are still bags there, otherwise it's too late.
  • Cardboard should be broken down and taped up into packs. Packs go inside the metal fence around the tree in front of 75 Christoper. (apparently the garbage men are very specific.)

Laser Maintenance

  • Talk to Joe Stilin if you are interested in caring for the laser. Here a list of maintenance tasks that need doing at different intervals.
    • Lens cleaning
    • Mirror cleaning (there are 3, two of which are not difficult to access.)
    • Air filter cleaning / replacement.
      • The air filter has 5 different layers and usually the top fiberglass one needs cleaning about every 2 weeks, depending on usage. The 3 below that get replaced after 1000 hours. From top down, they are:
        • Screen
        • Fiberglass
        • Cartridge
        • 70lbs activated charcoal
        • fiberglass
    • Beam alignment ( this is rarely done, usually after tube replacement.)
    • Bed leveling (also rarely needed)

CNC Maintenance

  • Talk to Arjen if you are interested in caring for the CNC. Manintenance taks are:
    • Resurfacing the spoilboard. ( every 4-6 weeks depending on usage )
    • Greasing the Z ballscrew and Z linear bearings.